- PLC Programming
- SCADA Integration
- Remote Site Integration
- Functional Testing
- Commissioning Support
- Live-System Cutover Support
- Control Narrative Development
CID supported a 6-year design-build program involving upgrades to multiple pump stations across Silicon Valley Clean Water’s system. As a core member of the project team, CID worked closely with stakeholders through extensive workshops to define operational requirements and translate them into reliable control system designs.
The work required development of layered documentation and carefully vetted logic to support live cutovers at critical wastewater infrastructure facilities, minimizing risk and maintaining continuous operation.